Civil Works |
|
CRISP Phase 2B_Pre- Turnaround/ Turnaround (Jurong) Civil Works at ExxonMobil Asia Pte Ltd. |
Apr 2023 |
Oiltanking Tank Farm Project |
Nov 2021 |
CRISP Existing Site Project at ExxonMobil Asia Pte Ltd |
Aug 2021 |
Senoko OFD Admiralty Road West Civil Works |
Dec 2020 |
Chevron Thiam Joo Road Repair Work |
Dec 2020 |
Chiyoda Civil & Pilling Work for LS Crude Project |
Dec 2019 |
Chevron Tank Farm Bund wall Project |
Apr 2019 |
SCPU Cooling Tower Basin Cleaning for Turnaround 2018 for ExxonMobil Asia Pacific Pte Ltd |
Oct 2018 |
Chevron Tank Farm Project for Chevron Singapore |
Jun 2018 |
Shipyard Road Excavation and Inspection Work for ExxonMobil Asia Pacific Pte Ltd |
Sep 2016 |
Construction of a Carpark Project for ExxonMobil Asia Pacific Pte Ltd |
Mar 2016 |
Removal of existing damaged tank base coating, Installation of new mastic sealant to tank base, Concrete repair work to existing piperack structure for ExxonMobil Asia Pacific Pte Ltd |
Jul 2015 |
Proposed Design and Reclamation at Ayer Chawan Phase 2 for Hyundai Engineering & YTC JV |
Feb 2015 |
Marine Works |
|
Underdeck Repair Works for Wharfs J12A/B at Jurong Port Universal Terminal |
May 2023 |
Turnaround OM1 Fender Replacement Work at ExxonMobil Asia Pte Ltd |
May 2023 |
Chevron Structure Repair Works at Jetty 4 |
May 2023 |
PAC Berth 4-5 Trestle Way Pile Repair works |
Apr 2022 |
Replacement of Fender Frontal Panel at Jetty 5 & 6 at Jurong Port Universal Terminal |
Jan 2022 |
EM Underdeck Repair for OE2 |
Dec 2021 |
Singapore Polytechnic Polymarina Wooden Fender Replacement |
Jun 2021 |
Chevron Replacement & Installation of 4nos of Fender System at Jetty 4 |
May 2021 |
Chevron Replacement & Installation of 4Nos of Fender System at Jetty 5 |
Dec 2020 |
Structural Repair Works To Chevron Tanjung Penjuru Terminal Jetty 2 & 5 |
Sep 2020 |
EM PAC Berth Pile Repair Works_40 Piles |
Apr 2019 |
Jetty 6 Under Deck Repair for Chevron Singapore |
Dec 2018 |
EM Berth #4 Under Deck Repair for ExxonMobil Asia Pacific Pte Ltd |
Oct 2018 |
PAC Berth Pile Repair Project for ExxonMobil Asia Pacific Pte Ltd |
Feb 2018 |
Jetty 3A underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore |
Aug 2017 |
Concrete Floating Dry Dock Project (USA) |
May 2017 |
Pulau Ayer Chawan Oil Refinery (PAC) Berth Number 1 & 2 Cell Fender Replacement for ExxonMobil Asia Pacific Pte Ltd |
May 2017 |
MJ18 Jetty Repair Work for Oiltanking Singapore Limited |
Jan 2017 |
Jetty 3 underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore |
Nov 2015 |
Replacement of fender frames, welding and replacement of corroded berth structure, blasting & painting of bollards and steel structure for ExxonMobil Asia Pacific Pte Ltd |
Aug 2015 |
Jetty 5 Fender Repair Work at Chevron Penjuru Terminal for Chevron Singapore |
May 2015 |
Jetty Berth 4 Phase 1 reinforcement of marine piles for ExxonMobil Asia Pacific Pte Ltd |
Feb 2015 |
Construction Works for the Docks, Wharves, Quays and Pier at the Tuas Phase 2 (Sembcorp Marine (Jurong Shipyard)) for Zhen Hua (Singapore) Pte Ltd |
Dec 2014 |
Reinstatement Works to Oiltanking Jetty9-MD9A, Catwalks and its Support |
Oct 2014 |
Others |
|
Chevron - Soil Investigation Works |
Dec 2019 |
Fireproofing work & Concrete repair work at Singapore Chemical Plant for ExxonMobil Asia Pacific Pte Ltd |
Jan 2019 |