| Civil Works |
|
| CRISP Phase 2B_Pre- Turnaround/ Turnaround (Jurong) Civil Works at ExxonMobil Asia Pte Ltd. |
Apr 2023 |
| Oiltanking Tank Farm Project |
Nov 2021 |
| CRISP Existing Site Project at ExxonMobil Asia Pte Ltd |
Aug 2021 |
| Senoko OFD Admiralty Road West Civil Works |
Dec 2020 |
| Chevron Thiam Joo Road Repair Work |
Dec 2020 |
| Chiyoda Civil & Pilling Work for LS Crude Project |
Dec 2019 |
| Chevron Tank Farm Bund wall Project |
Apr 2019 |
| SCPU Cooling Tower Basin Cleaning for Turnaround 2018 for ExxonMobil Asia Pacific Pte Ltd |
Oct 2018 |
| Chevron Tank Farm Project for Chevron Singapore |
Jun 2018 |
| Shipyard Road Excavation and Inspection Work for ExxonMobil Asia Pacific Pte Ltd |
Sep 2016 |
| Construction of a Carpark Project for ExxonMobil Asia Pacific Pte Ltd |
Mar 2016 |
| Removal of existing damaged tank base coating, Installation of new mastic sealant to tank base, Concrete repair work to existing piperack structure for ExxonMobil Asia Pacific Pte Ltd |
Jul 2015 |
| Proposed Design and Reclamation at Ayer Chawan Phase 2 for Hyundai Engineering & YTC JV |
Feb 2015 |
| Marine Works |
|
| Underdeck Repair Works for Wharfs J12A/B at Jurong Port Universal Terminal |
May 2023 |
| Turnaround OM1 Fender Replacement Work at ExxonMobil Asia Pte Ltd |
May 2023 |
| Chevron Structure Repair Works at Jetty 4 |
May 2023 |
| PAC Berth 4-5 Trestle Way Pile Repair works |
Apr 2022 |
| Replacement of Fender Frontal Panel at Jetty 5 & 6 at Jurong Port Universal Terminal |
Jan 2022 |
| EM Underdeck Repair for OE2 |
Dec 2021 |
| Singapore Polytechnic Polymarina Wooden Fender Replacement |
Jun 2021 |
| Chevron Replacement & Installation of 4nos of Fender System at Jetty 4 |
May 2021 |
| Chevron Replacement & Installation of 4Nos of Fender System at Jetty 5 |
Dec 2020 |
| Structural Repair Works To Chevron Tanjung Penjuru Terminal Jetty 2 & 5 |
Sep 2020 |
| EM PAC Berth Pile Repair Works_40 Piles |
Apr 2019 |
| Jetty 6 Under Deck Repair for Chevron Singapore |
Dec 2018 |
| EM Berth #4 Under Deck Repair for ExxonMobil Asia Pacific Pte Ltd |
Oct 2018 |
| PAC Berth Pile Repair Project for ExxonMobil Asia Pacific Pte Ltd |
Feb 2018 |
| Jetty 3A underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore |
Aug 2017 |
| Concrete Floating Dry Dock Project (USA) |
May 2017 |
| Pulau Ayer Chawan Oil Refinery (PAC) Berth Number 1 & 2 Cell Fender Replacement for ExxonMobil Asia Pacific Pte Ltd |
May 2017 |
| MJ18 Jetty Repair Work for Oiltanking Singapore Limited |
Jan 2017 |
| Jetty 3 underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore |
Nov 2015 |
| Replacement of fender frames, welding and replacement of corroded berth structure, blasting & painting of bollards and steel structure for ExxonMobil Asia Pacific Pte Ltd |
Aug 2015 |
| Jetty 5 Fender Repair Work at Chevron Penjuru Terminal for Chevron Singapore |
May 2015 |
| Jetty Berth 4 Phase 1 reinforcement of marine piles for ExxonMobil Asia Pacific Pte Ltd |
Feb 2015 |
| Construction Works for the Docks, Wharves, Quays and Pier at the Tuas Phase 2 (Sembcorp Marine (Jurong Shipyard)) for Zhen Hua (Singapore) Pte Ltd |
Dec 2014 |
| Reinstatement Works to Oiltanking Jetty9-MD9A, Catwalks and its Support |
Oct 2014 |
| Others |
|
| Chevron - Soil Investigation Works |
Dec 2019 |
| Fireproofing work & Concrete repair work at Singapore Chemical Plant for ExxonMobil Asia Pacific Pte Ltd |
Jan 2019 |