Civil Works
CRISP Phase 2B_Pre- Turnaround/ Turnaround (Jurong) Civil Works at ExxonMobil Asia Pte Ltd. Apr 2023
Oiltanking Tank Farm Project Nov 2021
CRISP Existing Site Project at ExxonMobil Asia Pte Ltd Aug 2021
Senoko OFD Admiralty Road West Civil Works Dec 2020
Chevron Thiam Joo Road Repair Work Dec 2020
Chiyoda Civil & Pilling Work for LS Crude Project Dec 2019
Chevron Tank Farm Bund wall Project Apr 2019
SCPU Cooling Tower Basin Cleaning for Turnaround 2018 for ExxonMobil Asia Pacific Pte Ltd Oct 2018
Chevron Tank Farm Project for Chevron Singapore Jun 2018
Shipyard Road Excavation and Inspection Work for ExxonMobil Asia Pacific Pte Ltd Sep 2016
Construction of a Carpark Project for ExxonMobil Asia Pacific Pte Ltd Mar 2016
Removal of existing damaged tank base coating, Installation of new mastic sealant to tank base, Concrete repair work to existing piperack structure for ExxonMobil Asia Pacific Pte Ltd Jul 2015
Proposed Design and Reclamation at Ayer Chawan Phase 2 for Hyundai Engineering & YTC JV Feb 2015
Marine Works
Underdeck Repair Works for Wharfs J12A/B at Jurong Port Universal Terminal May 2023
Turnaround OM1 Fender Replacement Work at ExxonMobil Asia Pte Ltd May 2023
Chevron Structure Repair Works at Jetty 4 May 2023
PAC Berth 4-5 Trestle Way Pile Repair works Apr 2022
Replacement of Fender Frontal Panel at Jetty 5 & 6 at Jurong Port Universal Terminal Jan 2022
EM Underdeck Repair for OE2 Dec 2021
Singapore Polytechnic Polymarina Wooden Fender Replacement Jun 2021
Chevron Replacement & Installation of 4nos of Fender System at Jetty 4 May 2021
Chevron Replacement & Installation of 4Nos of Fender System at Jetty 5 Dec 2020
Structural Repair Works To Chevron Tanjung Penjuru Terminal Jetty 2 & 5 Sep 2020
EM PAC Berth Pile Repair Works_40 Piles Apr 2019
Jetty 6 Under Deck Repair for Chevron Singapore Dec 2018
EM Berth #4 Under Deck Repair for ExxonMobil Asia Pacific Pte Ltd Oct 2018
PAC Berth Pile Repair Project for ExxonMobil Asia Pacific Pte Ltd Feb 2018
Jetty 3A underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore Aug 2017
Concrete Floating Dry Dock Project (USA) May 2017
Pulau Ayer Chawan Oil Refinery (PAC) Berth Number 1 & 2 Cell Fender Replacement for ExxonMobil Asia Pacific Pte Ltd May 2017
MJ18 Jetty Repair Work for Oiltanking Singapore Limited Jan 2017
Jetty 3 underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore Nov 2015
Replacement of fender frames, welding and replacement of corroded berth structure, blasting & painting of bollards and steel structure for ExxonMobil Asia Pacific Pte Ltd Aug 2015
Jetty 5 Fender Repair Work at Chevron Penjuru Terminal for Chevron Singapore May 2015
Jetty Berth 4 Phase 1 reinforcement of marine piles for ExxonMobil Asia Pacific Pte Ltd Feb 2015
Construction Works for the Docks, Wharves, Quays and Pier at the Tuas Phase 2 (Sembcorp Marine (Jurong Shipyard)) for Zhen Hua (Singapore) Pte Ltd Dec 2014
Reinstatement Works to Oiltanking Jetty9-MD9A, Catwalks and its Support Oct 2014
Others
Chevron - Soil Investigation Works Dec 2019
Fireproofing work & Concrete repair work at Singapore Chemical Plant for ExxonMobil Asia Pacific Pte Ltd Jan 2019