Our Projects

Project List updated as of Jul 2018
Project Name Date Completed
Chevron Tank Farm Project for Chevron Singapore Jun 18
PAC Berth Pile Repair Project for ExxonMobil Asia Pacific Pte Ltd Feb 18
Jetty 3A underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore Aug 17
Concrete Floating Dry Dock Project (USA) May 17
Pulau Ayer Chawan Oil Refinery (PAC) Berth Number 1 & 2 Cell Fender Replacement for ExxonMobil Asia Pacific Pte Ltd May 17
MJ18 Jetty Repair Work for Oiltanking Singapore Limited Jan 17
Shipyard Road Excavation and Inspection Work for ExxonMobil Asia Pacific Pte Ltd Sep 16
Construction of a Carpark Project for ExxonMobil Asia Pacific Pte Ltd Mar 16
Fireproofing work & Concrete repair work at Singapore Chemical Plant for ExxonMobil Asia Pacific Pte Ltd Jan 16
Jetty 3 underdeck repair work at Chevron Penjuru Terminal for Chevron Singapore Nov 15
Replacement of fender frames, welding and replacement of corroded berth structure, blasting & painting of bollards and steel structure for ExxonMobil Asia Pacific Pte Ltd Aug 15
Removal of existing damaged tank base coating, Installation of new mastic sealant to tank base, Concrete repair work to existing piperack structure for ExxonMobil Asia Pacific Pte Ltd Jul 15
Jetty 5 Fender Repair Work at Chevron Penjuru Terminal for Chevron Singapore May 15
Jetty Berth 4 Phase 1 reinforcement of marine piles for ExxonMobil Asia Pacific Pte Ltd Feb 15
Proposed Design and Reclamation at Ayer Chawan Phase 2 for Hyundai Engineering & YTC JV Feb 15
Construction Works for the Docks, Wharves, Quays and Pier at the Tuas Phase 2 (Sembcorp Marine (Jurong Shipyard)) for Zhen Hua (Singapore) Pte Ltd Dec 14
Reinstatement Works to Oiltanking Jetty9-MD9A, Catwalks and its Support Oct 14